翻訳と辞書 |
Naigaon railway bridge : ウィキペディア英語版 | Naigaon railway bridge
The Naigaon railway bridge is a proposed railway bridge to connect Juchandra and Naigaon Railway station over the Sopara Creek. The proposal has been passed for the required approvals since 2010,〔 〕 but the 2014 elections have brought about a political realignment that will allow for the required approvals. The bridge, with an estimated budget of ₨108 crore, will span with a width of . The bridge is expected to aid in local commutation as well as in the transport of fish, a major area industry. , no deadline had been announced for the completion of the bridge, although it is expected to require two to three years. The Bahujan Vikas Aghadi has already inaugurated the event on 9 Nov2014 at the local rickshaw stand by felicitating the local bodies who have contributed by means of sharing their land for this project. ==References==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Naigaon railway bridge」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|